Australia

Welcome to the Schneider Electric Website

Welcome to our website.

You can choose another country to view available products or go to our Global website for company information.

Choose another country or region

Determining Total Cost of Ownership for Data Center and Network Room Infrastructure

  • Reference

    APC_CMRP-5T9PQG_EN

  • Type

    White Paper

  • Languages

    English

  • Date

    01/03/2010

  • Version

    1.0

Download
  • Reference

    APC_CMRP-5T9PQG_EN

  • Type

    White Paper

  • Languages

    English

  • Date

    01/03/2010

  • Version

    1.0

Description:

An improved method for measuring total cost of ownership (TCO) of data center and network room physical infrastructure and relating these costs to the overall Information Technology infrastructure is described, with examples. The cost drivers of TCO are quantified. The largest cost driver is shown to be unnecessary unabsorbed costs resulting from the oversizing of the infrastructure.

Files for Download

Add to My Documents

Description:

An improved method for measuring total cost of ownership (TCO) of data center and network room physical infrastructure and relating these costs to the overall Information Technology infrastructure is described, with examples. The cost drivers of TCO are quantified. The largest cost driver is shown to be unnecessary unabsorbed costs resulting from the oversizing of the infrastructure.

Files for Download

My Documents

Store, email, and share your favourite documents and products.

View My Documents
Nos conseillers sont disponibles pour répondre à vos questions de 8h00 à 18h00 du lundi au vendredi toute l'année.