This simple solution uses current control to automatically monitor and shed a load if a pre-set limit is exceeded.
Value proposition
Avoid paying peak demand penalties, by installing devices which can control consumption and automatically shut down non-critical loads.
Shed less critical loads and keep the critical process running.
Differentiation factors
Use current control to automatically monitor. It is very easy to install and just by adding a time delay can be programmed before the load is re-connected.
By adding a GTC building and management system control safety can be enhanced in an installation. The load can be turned on again only after being checked by competent personnel.
Solution architecture
Discover more
Requests for Solutions, Products and Services information
Solution breakdown & downloads
Main Products & Systems > Protection circuit-breaker: C60 and DPN
> Current control: RCI
> Time delay: ACTt
> Current transformer: Ti
> Load shedding contactor: CDsc