Main drivers
- Effects of power outages: energy availability
- Need for high quality energy
- Energy cost effectiveness
Value proposition
- Quality of service and network reliability multiplied by 2:
- 50% less outage duration
- Areas affected by the faults divided by 2.
- Monitored & improved power quality
- Operation and capital costs reduced by 30% thanks to:
- non distributed energy cost reduction
- operating cost reduction during major fault on the network
- maintenance cost reduction
- Easier implementation than usual SCADA project
- development time 50% shorter thanks to preconfigured architectures
- resource needs 40% lower and easier project management
- scalability 10 times faster than traditional SCADA
Differentiation factors
- Cost efficient solution
- Fast project development
- Low maintenance